Alliant Power Powerstroke Injector LONG LEAD AP63804AE Brand New with core

In stock

The Alliant Powerstroke Injector a brand-new stock replacement injector for your 1994-2003 Ford 7.3L Powerstroke. These injectors are tested to factory specs and with tungsten coated plungers they will last.Features:Direct-FitTungsten Coated PlungerFactory

$600.00 $147.00
Select Core Type:

Category:
Share :

The Alliant Powerstroke Injector a brand-new stock replacement injector for your 1994-2003 Ford 7.3L Powerstroke. These injectors are tested to factory specs and with tungsten coated plungers they will last.

Features:

  • Direct-Fit
  • Tungsten Coated Plunger
  • Factory Tested to OE Specs
  • 2 Years/Unlimited Miles Warranty

Applications:

AP63800AA (AA Fuel Injector) – 1994-1997 Ford 7.3L Powerstroke

AP63801AB (AB Fuel Injector) – 1997 Ford 7.3L Powerstroke (California Models) & 1999 Ford 7.3L Powerstroke (Early Models)

AP63803AD (AD Fuel Injector) – 1999.5-2003 Ford 7.3L Powerstroke

AP63804AE (AE Fuel Injector) – 1999.5-2003 Ford 7.3L Powerstroke (#8 Long Lead)

Note:Long Lead injector in the number 8 cylinder, used in conjunction with AP63803AD injectors to help the Ford cackle problem. Must look for LL on top of the injector in cylinder number 8

WARRANTY INFO:
2 Year / Unlimited Mileage

Reviews

There are no reviews yet.

Be the first to review “Alliant Power Powerstroke Injector LONG LEAD AP63804AE Brand New with core”

Your email address will not be published. Required fields are marked *

Related products